Elementary Schools

Carollton Elementary - Built in 1968

 

 

Safety, Security and Accessibility             

  • New Secure Front Entrance, Main Office, ADA Ramp
  • Convert former Office space to Special Education Spaces with ADA-compliant Restroom
  • New Visitor and Handicap Parking Lot on East Side of Building
  • Interior Doors - Replace Doors & Paint Frames, Widen 44 Openings for ADA Requirements
  • Student Toilet Room Renovations for ADA Compliance - Fixture and Accessory Replacement & Partition Additions
  • Individual Classroom Toilets - Expand Footprints to meet ADA Compliance & New Finishes & Fixtures
  • Replace Non-Compliant Stairwell Railings/Guardrails & Remove Corridor Gates
  • Replace 1968 Electrical Distribution Equipment & Fire Alarm Modifications
  • Asbestos Abatement

Separate Elementary Gymnasiums & Cafeterias               

  • Gym Addition, Cafeteria Remodeling (Windows, Ceiling Acoustics, etc.)

Elementary Learning Environments

  • Instructional Support Spaces: ELL, Learning Coach, Special Education Area w/Sensory Room, Language Office
  • Replace Casework & Countertops in Classrooms
  • Replace Flooring - Vinyl Tile in Hallways/Classrooms, Porcelain Tile in Toilet Rooms & Kindergarten, Sensory, and Speech Carpet

Cedar Hills Elementary - Built in 1966

Cedar Hills Proposed Plan for 2018 Referendum
 

 

Safety, Security and Accessibility

  • New Secure Front Entrance, Main Office, ADA Ramp
  • Convert Old Office to Breakout/Makers Space
  • New Parent Loop Entrance off 24th
  • Fencing for Play Area, New Wood Fence to North Boundary
  • West Playground Asphalt Reconstruction - New Pavement and Base, Grass Swale, & Repainting
  • Interior Doors - Replace Doors & Paint Frames, Widen 39 Openings for ADA Requirements, Replace Stairwell Railings
  • Student Toilet Room Renovations for ADA Compliance - Fixture and Accessory Replacement & Partition Additions
  • Individual Classroom Toilets - Expand Footprints to meet ADA Compliance & New Finishes & Fixtures
  • Replace 1966 Electrical Distribution Equipment - New Switchboard, Branch Circuit Panels, and Surge Protection Device
  • Structural Concrete Repairs/Restoration - Remove Concrete, Grind Rust off Rebar, Rust Inhibitor and Match Concrete
  • Asbestos Abatement

Separate Elementary Gymnasiums & Cafeterias

  • Gym Addition, Cafeteria Remodeling, ADA Ramp, Connection Hall & Special Education Area
  • North and East Lots and Front Drive Asphalt Repairs - Crack sealing & patching

Elementary Learning Environments

  • Replace Casework & Countertops in Classrooms

Deerfield Elementary - Built in 2005

 

Safety, Security and Accessibility

  • Improve Site Safety by Enlarging Parent Exit and Adding Parking Stalls Along East Drive

Elementary Learning Environments

  • Renovate Lower Level Computer Lab into Conference, Intervention & Project Rooms. Create Spec. Ed. Sensory Room.

Edgewood Elementary - Built in 1962

Edgewood Elementary proposed plans for 2018 referendum
 

 

Safety, Security and Accessibility

  • Office Reconfiguration to Enlarge Health Room, Add Security Doors, Enclose Server Room, ADA Ramp
  • Second Parent Vehicle Entrance, Tennis Parking, Building Stormwater Management, Sidewalk to High School
  • Interior Doors - Replace Doors & Paint Frames, Widen 47 Openings for ADA Requirements, Replace Stairwell Railings
  • Individual Classroom Toilets - Expand Footprints to meet ADA Compliance & New Finishes & Fixtures
  • Asbestos Abatement

Separate Elementary Gymnasiums & Cafeterias

  • Gym Addition & Cafeteria Remodeling
  • Asphalt Patching - Front Drive, West Playground, and South Paths

Elementary Learning Environments

  • Create Appropriate Instructional Support Spaces: Language, Speech, Psychologist, OT, Intervention, ELL, Conference
  • Replace Casework & Countertops in Classrooms
  • Replace Ceilings - Remove 2x4 Tiles and Install New 2x2 Tiles, Grid, & Reinstall Systems
  • Replace Flooring - Vinyl Tile In Classrooms, Tile in Toilet Rooms & Carpet in Offices/IMC

Meadowview Elementary - Built in 1959

Meadowview Elementary proposed plans for 2018 referendum

 

 

Safety, Security and Accessibility

  • Office Reconfiguration to Enlarge Health Room, Add Security Doors, Enclose Server Room, ADA Ramp
  • Improve Parent Drop-Off with New Drive Off of McGraw, New South Parking Lot, Curb/Gutter and Connection to Sewer
  • Interior Doors - Replace Doors & Paint Frames, Increase Door Opening Size for ADA Compliance, Create Secure Doorway into Office, & Stairwell Railing Replacement
  • Student Toilet Room Renovations for ADA Compliance - Fixture and Accessory Replacement & Partition Additions
  • Individual Classroom Toilets - Expand Footprints to meet ADA Compliance & New Finishes & Fixtures
  • Student/Staff Elevator Addition (for ADA compliance)
  • Asbestos Abatement

Separate Elementary Gymnasiums & Cafeterias

  • Gym Addition & Cafeteria Remodeling

Elementary Learning Environments

  • Create 2 Special Education Areas & Student Ed. Services Spaces
  • Replace Corridor Ceilings - Remove 2x4 Tiles and Install New 2x2 Tiles and Grid
  • Replace Casework & Countertops in Classrooms

Shepard Hills Elementary - Built in 1971

Shepard Hills Elementary proposed plans for 2018 referendum

 

 

Safety, Security and Accessibility

  • New Parent Drive Entrance, Relocate Playground, New Service Drive
  • Student Toilet Room Renovations for ADA Compliance - Fixture and Accessory Replacement & Partition Additions
  • Individual Classroom Toilets - Expand Footprints to meet ADA Compliance & New Finishes & Fixtures
  • Stairwell Railing Replacements, Expand K5 Toilet Room Doorways, and Replace Door Hardware for ADA Compliance
  • Replace 1971 Electrical Distribution Equipment - Includes Main Service Panel, Branch Panels, and MCC
  • Asbestos Abatement

Separate Elementary Gymnasiums & Cafeterias

  • Gym Addition, Cafeteria Remodeling, ADA Ramp, Relocate playground

Elementary Learning Environments

  • Expand Art for Storage & Kiln, and Convert Storage Room into Band Room in Lower Level
  • Replace Demountable Wall Partitions with Solid Walls for Sound Control, Fire Sprinkle Entire Building
  • Update Main Entrance Finishes & Update Wood Paneling in Various Classrooms
  • Update Masonry Wall Paint, Paint Doors and Frames & Replace Classroom Casework and Sinks
  • Replace Carpet in the LMC and Offices, Replace VCT in the Art Room, Install Tile in Rest Room

Middle Schools

East Middle School - Built in 2008

 

Safety, Security and Accessibility

  • Add Security Fencing to Enclose Classroom Courtyards
  • Security Doors for Building Compartmentalization
  • North Staff Lot Reconstruction - New Asphalt Pavement & Base, Restriping, Signage, Add Two ADA Stalls
  • North Exit Drive Reconstruction - New Asphalt Pavement & Base & Curb/Gutter and Signage
  • Bus Lot & Entrance Drive Reconstruction - New Asphalt Pavement & Base and Signage
  • West Lot & Drive Reconstruction - New Asphalt Pavement & Base, Restriping, Signage and New Catch Basin
  • Gymnasium Lot Reconstruction - New Asphalt Pavement & Base, Striping, and Signage

West Middle School - Built in 1993

West Middle School proposed plans for 2018 referendum

 

 

Safety, Security and Accessibility

  • Security Doors for Building Compartmentalization
  • Improve Crisis Management via Office Reconfiguration for SRO, Guidance, Psych, Social Worker, Conference Room
  • Student Toilet Room Renovations for ADA Compliance - Fixture and Accessory Replacement & Partition Additions

Secondary Learning Environment Improvements

  • Eliminate Fixed Lecture Hall Seating and Reconfigure Floor Tiers, Improve ADA Accessibility
  • Interior Windows into Multipurpose Room, Double Hallway Doors to Storage
  • Flexible Learning Space North Wing: Create Project Rooms & Breakout Space, New LMC Furniture
  • Replace Ceilings - Remove 2x4 and Install 2x2 Tile, Grid, and Reinstall Devices and Paint Gypsum Soffits
  • Replace Existing Flooring - Vinyl Tile in Hallways/Classrooms, Carpet in Offices/IMC, and Main Entry Rubber Treads
  • Operable Wall Replacement - Replace Classroom and Cafeteria Operable Walls with Marker Boards

High School

Oak Creek High School - Built in 1960

oak creek high school proposed plans for 2018 referenedum

 

 

Safety, Security and Accessibility

  • New HS Parking Lot on Southeast Corner for Approximately 400, Campus Storm Water Retention Pond
  • Security Doors for Building Compartmentalization
  • Student Toilet Room Renovations for ADA Compliance - Fixture and Accessory Replacement & Partition Additions
  • Replace Stair Railings for ADA Compliance
  • Asbestos Abatement

Secondary Learning Environment Improvements

  • Convert Multipurpose Room into Cafeteria Expansion
  • Vision Glass from LMC into Courtyard
  • Expand Band & Choir Rooms, Relocate Practice Rooms & Create Additional Storage
  • Enclose Auxiliary Gym Mezzanine to Create Separate Multipurpose Physical Education Room
  • Replace Casework and Countertops in First and Second Floor Classrooms
  • Replace Music Instrument Storage Casework
  • Replace Damaged Interior Doors - New Doors, Hardware, and Frames
  • Replace Sagging 2x4 Ceiling Tiles with 2x2 Ceiling Tiles and Auxiliary Gym Ceiling, Repaint Painted Ceilings
  • Replace Existing Flooring in High Priority Areas - Vinyl Tile, Sealed Concrete, Epoxy, Carpet, and Tile
  • Replace / Repair Existing Wall Finishes - Wall Tile, New Masonry Furring, & Tackable Wall Surface
  • Renovate Auxiliary Gym - Replace Damaged Bleachers, Equipment, Ceiling, Paint, and Sound System
  • Renovate Auxiliary Gym - Replace Deteriorated, Uneven Flooring

High School Performing Arts Education Center

  • Construct 850 Seat Performing Arts Center on SE Corner of High School

High School Career & Technical Education (CTE)

  • Site Costs Associated with CTE/Auditorium Additions (Pavement, Utilities, Grading, Storm Water)
  • CTE Renovation & Expansion (Manufacturing, Machine, Woods, Construction, Engineering)
  • High-Bay Auto Shop Addition for 5 Lifts & Storage
  • Relocate Computer Science & Graphic Arts (Add Air Conditioning)
  • Create New Culinary Arts Lab, FACS Lecture, Child Care Room
  • Remodel & Expand Health Science and Textiles Labs on 2nd Floor
  • Existing Tech Ed Area HVAC Improvements - Metals Shop Exhaust, Replace Woods Dust Collector, Tech-Ed Cooling

Physical Education & Fields

Physical Education & Fields

 
 

Oak Creek High School

  • Construct New Competition Soccer Field on HS Campus with Lights

East Middle School

  • Construct New Varsity Baseball Field w/Lighting, JV Softball Field, Concessions, Parking, Fencing, Lights for Varsity Softball
  • Add to Install Synthetic Turf Infields on 2 Fields (Varsity Baseball & Varsity Softball)
  • Construct Public Restrooms for the Fields via an Addition to West End of Maintenance Shop